...
House 2 Home / Greensboro, North Carolina

Two bathroom quotes. Two different jobs?

One estimate includes moving the drain, rebuilding the shower floor and fixing the ventilation. The other says “new shower.” Before comparing the totals, find out whether they describe the same work.

SHORT ANSWER

To compare bathroom remodeling quotes in Greensboro, make sure each contractor priced the same scope: demolition, plumbing, electrical, shower waterproofing, materials, permits, cleanup and the response to hidden damage. Then compare payment terms, schedule, insurance and who is doing the work. A lower total alone cannot tell you which offer costs less for the finished bathroom you want.

Before requesting prices

Give every contractor the same bathroom

Write down what must change and what you want to keep. A new shower in the existing tub space is a different job from moving walls, adding a curbless entry, relocating the toilet or replacing all the flooring. If each contractor works from a different set of assumptions, the numbers will not compare cleanly.

Include the room’s rough dimensions, photos, your preferred shower or tub arrangement, the fixtures staying in place, and any known leaks or soft flooring. Tell each company whether you want a price for the entire bathroom or only the wet area. If you have not settled on a shower design, read our guides to replacing a tub with a walk-in shower and checking whether a curbless shower will work before comparing detailed bids.

Read past the total

Put the scope beside the price

Use this table to find the questions hiding inside short estimates. A brief quote is not automatically a bad quote, but missing details need answers before you sign.

Line itemWhat to look forQuestion to ask if missing
DemolitionWhat comes out, debris removal, protection of nearby rooms.Does the price cover removal and disposal of the old shower, tub or tile?
Plumbing and electricalDrain and supply changes, outlets, lighting, fan and who handles each trade.Is the current layout assumed to stay exactly where it is?
Shower constructionShower base or floor, waterproofing approach, drain and wall assembly.What is behind the tile, and how does it connect to the drain?
MaterialsSpecific fixture and finish allowances or selected models.Which choices are included, and what happens if I choose something else?
Permits and inspectionsWhich party obtains required permits and what inspections are planned.Are fees and inspection coordination included?
Hidden conditionsHow rotten subfloor, leaks or unexpected framing work will be documented and priced.Who approves extra work before it begins?
CompletionGlass, trim, final fixtures, cleanup, punch list and warranty terms.What must be complete before the last payment?

The North Carolina Licensing Board for General Contractors tells homeowners to compare the cost, quantity and quality of materials, along with payment timing and the expected schedule.

Interactive worksheet

Which details are actually in writing?

Open two estimates and check only the items they clearly document. The bars count documented categories, not workmanship, value, price or contractor quality. Use the missing items as questions for each company.

Quote A

Mark what the written estimate specifies.

Quote B

Mark what the written estimate specifies.

Quote A0 of 8 documented
Quote B0 of 8 documented

Your selections stay in this browser tab. This checklist does not evaluate construction quality or replace a detailed review of the contract.

One line worth unpacking

“Install tile shower” is not a waterproofing plan

Tile and grout are what you see. Ask what shower base, wall waterproofing and drain connection the contractor proposes. Ask whether replacing soft subfloor or correcting an old leak is included, excluded or subject to a written change once demolition reveals the condition.

A curbless shower adds another question: how will the new shower floor meet the bathroom floor while directing water toward the drain? An estimate that includes that work should be compared with another that includes the same work. Our curbless shower guide shows the floor and drain relationship.

The EPA’s bathroom remodeling guidance also calls for wet walls that keep water out of cavities and an exhaust fan that vents outside rather than into an attic. Check whether the ventilation work you need appears in the quote.

An illustrated shower is divided into visible finishes, waterproofing and underlying structure. Quotes may cover different layers.VISIBLE FINISHWATERPROOFING + DRAINFLOOR + FRAMINGWhich layers does each quote cover?
Conceptual illustration. It does not depict a construction specification or any particular contractor’s method.
Verify the local details

License and permit questions are separate

North Carolina’s Licensing Board says a general contractor must be licensed when the contract is valued at $40,000 or more. A bathroom job below that amount is not automatically exempt from other requirements. Electrical and plumbing trades have their own licensing rules. The North Carolina Department of Justice links to the relevant trade license checks, and the board offers a general contractor license search.

For work within Greensboro, the city explains its residential building and separate trade permit process. Ask the contractor which permits apply to the proposed plumbing, electrical, mechanical or structural changes and who obtains them. Compare this answer across bids. A low price that excludes work requiring permits is not the same scope as a price that includes it.

Ask for the exact business name. Check the license under the entity that will sign your contract, confirm insurance with the insurer, and put permit responsibility in writing. Do not assume a logo or a license number in an advertisement settles those questions.

Before the signature

Read the payment plan with the work plan

1

Start and finish

Are projected dates written down, and does the estimate say what could change them?

2

Change orders

How are hidden conditions documented, priced and approved before extra work starts?

3

Final payment

What inspections, cleanup and punch-list items must be complete first?

The North Carolina Licensing Board recommends a written contract with a detailed scope, payment schedule, start and finish dates, permit responsibility, coverage and warranty terms. It advises against large down payments and recommends linking payments to completed work. The FTC also cautions against paying the full project amount up front.

Save the estimate, contract, drawings, material selections and written changes together. A text message about adding a niche or moving a fixture should become a clear written change to the agreed scope, with its price and schedule effect.

Take this to the consultation

Eight questions that make bids easier to compare

  1. What exactly is included in demolition and disposal?
  2. Are the drain, valves, wiring and ventilation staying in place?
  3. What is the shower waterproofing system, and how is it joined to the drain?
  4. What material models are selected, and what allowances are still open?
  5. Which required permits and inspections are included?
  6. What happens if demolition uncovers a leak or damaged subfloor?
  7. Who will do the work, and what is the proposed payment schedule?
  8. What cleanup, warranty documents and final walkthrough are included?

For a starting budget discussion, read our Greensboro bathroom remodeling cost guide. To see completed work, visit the bathroom project gallery.

Fast answers

Common questions about bathroom estimates

How many bathroom remodeling quotes should I get?

The North Carolina Department of Justice recommends at least three written estimates. Give each contractor the same project brief so you can compare the scope as well as the price.

Should I choose the lowest bathroom remodel bid?

Compare what each bid includes first. A lower number may reflect different materials, fewer tasks, open allowances or work excluded from the price. Ask the contractor to explain a large difference in writing.

Does a Greensboro bathroom remodel always need a general contractor license?

The North Carolina Licensing Board says the general contractor license requirement applies when the contract is $40,000 or more. Plumbing and electrical trades can have separate licensing requirements, and permits depend on the work. Check the exact project and business before signing.

What if the contractor discovers water damage after demolition?

Ask before work starts how hidden damage will be photographed, explained and priced. Approve changes in writing before additional work proceeds, except for any immediate action needed to secure the site.

Sources and further reading

  1. North Carolina Licensing Board for General Contractors, Building, Remodeling, Improving Your Home, estimates, contracts and license threshold.
  2. North Carolina Department of Justice, Home Improvement, estimates, contract details and trade verification.
  3. Federal Trade Commission, How To Avoid a Home Improvement Scam, written estimates, payments and contracts.
  4. City of Greensboro, Residential Construction, local permit overview.
  5. U.S. EPA, Remodeling Your Home and Indoor Air Quality, bathroom water and ventilation guidance.

House-2-Home

👋 Hello! How can I assist you today?